Plug a Connector

Git stays the only place where work is decided. Other tools, a Jira board for management or Confluence pages for readers who never open the forge, get a one-way copy of it: a connector reads the kit's state and makes the tool match it. Connectors live in their own repositories, with their own credentials and configuration, so the kit holds nothing tool-specific.

The snapshot

The kit's side is one command. From the planning repository, it prints the whole project as JSON: milestones, epics and what each delivers, tasks with the state status.sh gives them, their repository and pull request, the coverage of each requirement, and the planning documents.

sh .agents/skills/etabli-status/scripts/snapshot.sh

A connector reads that on stdin:

sh .agents/skills/etabli-status/scripts/snapshot.sh \
  | my-connector --config ~/shop.toml --dry-run

Each run compares the whole snapshot with the tool and applies the difference, so it can run by hand, after each merge, or from a scheduled job, with the same result. If the state cannot be derived, snapshot.sh prints nothing and exits non-zero, so no connector acts on a guess.

The connector contract

What a connector must and must not do is the contract in ADR-005. In short:

  • One way only. It writes to the tool and never to git.
  • Declared ownership. It names the fields it owns and writes only those. In Jira, sprints, points, priority and assignee stay with people, and an issue moved into a sprint stays there.
  • Visible corrections. A change to an owned field, such as a card dragged to another column, is put back on the next run, with a comment saying why.
  • Standard output. --dry-run prints each change without making it. Exit 0 means the tool matches, 1 means a change failed, and 2 means the input or configuration was refused before anything was touched.

To write a connector for another tool, start from that contract and the snapshot's schema number, and refuse any schema version the connector doesn't know.